InvestMoat

The power wall

Electricity, not chips, caps how fast AI grows by 2030. We hold little of it today because of price, and the chapter says what would change that.

November 2026 edition·7 min read·Updated

What we own on this view

4% of the IM25
Also in the chapter, not held

Number is today's moat score. Percent is the holding's IM25 weight.

A chip factory can add capacity in a couple of years. A power plant, a transmission line or a new reactor takes much longer, and needs permits, land and fuel. So as AI demand keeps growing, the limit moves from the chip to the plug. The scarce thing is no longer a GPU. It is a megawatt that can be delivered to a data center on a date someone can rely on.

How fast the power need is growing
Global data-center electricityIEA
TodayAbout 415 TWh (2024)
ExpectedAbout 945 TWh by 2030
US data centers, share of US electricityDOE lab report
TodayAbout 4.5%
Expected9.5% to 15% by 2030
US nuclear capacity targetMay 2025 executive orders
TodayAbout 100 GW
Expected400 GW by 2050

Why the megawatt is the bottleneck

The IEA expects global data-center electricity use to more than double by 2030, with data centers driving almost half of US demand growth 1. A US government lab puts data centers at about 4.5% of US electricity today and between 9.5% and 15% by 2030 2. Washington has noticed: executive orders target 400 GW of US nuclear by 2050 and ten large reactors under construction by 2030 3. A $80B government deal with Westinghouse 4 and a $120B US and South Korea reactor framework 5 followed.

The buyers are paying for new capacity, not just existing power. Constellation signed Amazon for 690 MW at Calvert Cliffs, including about 190 MW of upgrades 6, and Google for 890 MW of new capacity from upgrades across 11 reactors 7. We explain why the company with the most room to add wins the next contract in Constellation’s Amazon and Google Nuclear Deals.

What we own, and why it is not more

Constellation owns the largest US nuclear fleet, the one asset in this chapter that cannot be built again quickly at any price. Cameco mines and refines uranium and co-owns Westinghouse, which designs the reactors Washington wants built. Both are bottleneck owners in the sense this paper means.

So why does a chapter we call the binding constraint hold so little of the book? Price. The IM25’s rules weigh valuation as well as moat, and most of the power trade has been priced as if the shortage were certain. Cameco also sold much of its upside forward: in the third quarter it realized about $66 a pound while the spot price ended near $90 8, a gap we cover in Cameco Stock After Q3 2026. If these names fall back while the contracts keep coming, their valuation would improve and the rules would hold more of them. We would welcome that.

Gas turbines are the other fast answer. GE Vernova’s gas equipment backlog and slot reservations grew from 100 to 116 GW in the first half of 2026 9. We cover it, and it may join the book, but turbines are a product cycle more than a moat, which we argue in GE Vernova and the AI-Electricity Basket.

  1. 2030

    Power, not chip supply, is the main reason new US AI data centers are delayed.

    Likely
  2. 2030

    US data centers use at least 9.5% of US electricity, the low end of the DOE lab range.

    Likely
  3. 2031

    At least ten large reactors are under construction in the US.

    Bold

We are wrong if

Efficiency gains flatten data-center power demand so US data centers stay well below 9.5% of electricity by 2030, or gas, solar and batteries meet the demand so cheaply that contracted nuclear loses its price premium.

What we would sell first

CCJ first, because its price moves with the uranium market. CEG last: its existing fleet earns on contracts already signed, whatever happens to new reactors.

The dated checkpoints for this chapter are on the scorecard: Power becomes the bottleneck, not chips.

  1. IEA, AI is set to drive surging electricity demand from data centres · April 10, 2025
  2. E&E News, US data centers’ electricity use could double by 2030, DOE lab says · June 22, 2026
  3. World Nuclear News, Trump sets out aim to quadruple US nuclear capacity · May 24, 2025
  4. American Nuclear Society, Westinghouse signs $80B contract to meet AI demand · October 28, 2025
  5. World Nuclear News, USA and South Korea targeting six AP1000 and two APR1400 units · October 1, 2026
  6. Constellation, Constellation and Amazon announce 20-year power purchase agreement at Calvert Cliffs · September 30, 2026
  7. Google Cloud and Constellation, Google and Constellation agreement to bring 890 MW of new nuclear capacity to the PJM grid · October 6, 2026
  8. Cameco, Cameco Q3 2026 results · October 30, 2026
  9. GE Vernova, GE Vernova second quarter 2026 results · July 22, 2026
These are InvestMoat's views, written to be checked, not financial advice. The IM25 is chosen by its published rules, not by this paper.